Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/amtcocom/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/amtcocom/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/amtcocom/public_html/wp-includes/functions.php on line 6114
Our Projects – am-tco
Scroll Top
15 Bustan El Dekka St. – From Imad El Din – Downtown – Cairo

Our Projects

1Implementation of the infrastructure project
For the application gardens project in October
5 (Drainage – water – electricity) and it consists of
Low voltage transformer and cable rooms) and lampposts (MV-LV-Medium)And the network of the light current in the manholes and otherwise
Owner:
Syndicate of Applications

General Contractor: SHS 
Consultant : Arc Designs Engineering Consulting Office

2Implementation of the infrastructure project For the sixth stage project in October
Sheikh Zayed and consists of a room Low voltage transformers and cables –(Medium MV-LV lampposts)
Electromechanical works for a ground tank 2 (Water – and fire) capacity 250 m2
Owner:
Palm hils October 

General Contractor: SHS 
Consultant : Egypt for consultation 

3Implementation of the infrastructure project For Golf Views Project in October Sheikh Transformers rooms 5 Zayed and consists of a number MV- and low-medium voltage cables (And a generator room with its inclusions LV (ATS-EMDB)
Earthing systems.
Owner:
Palm hils October 

General Contractor: SHS 
Consultant : Ahmed Abdel Wareth AAW

4Implementation of the infrastructure project For the Ice Town Fifth Settlement project
(drainage – water – electricity) and it consists Transformers room 16 from distributor and tools Low-Medium Voltage Cables (MV-LV) and billets and lighting poles.
Light current and earthing system (Earthing systems).

Owner:
SODIC

General Contractor: SHS 
Consultant : Muharram Yakhum

5Implementation of the infrastructure project
For the Fifth Compound Villas Project (Drainage – water – electricity) and it consists Transformers room 12 from distributor and tools Low – medium voltage cables (MV-LV) and billets and lighting poles. Light current and earthing system
(Earthing systems).

Owner:
SODIC

General Contractor: SHS 
Consultant : Shaker group

6‫‪300‬‬ ‫‪K‬‬ ‫‪VAR‬‬ ‫‪P.F.C‬‬

Owner:

‫‪AL‬‬ ‫‪-‬‬ ‫‪AHRAM‬‬ ‫‪POULTRY‬‬ ‫‪LAB‬‬

‫‪MAIN‬‬ ‫‪CONTRCATOR‬‬  ‫‪HVAC‬‬ ‫‪COMPANY‬‬
‫‪SUB‬‬ ‫‪CONTRACTOR‬‬ ‫‪:‬‬‫‪AM-TCO‬‬ ‫‪COMPANY‬‬

Supplies latest work

1 – محور تحيا مصر

2 – محور ترعة الزمر

3 – الورش الكهروميكانيكية

4 – مترو الأنفاق

5 – المورونيل

6 – كبارى منطقة حلوان

7 – كوبرى جرجا

8 – إدارة المقاولون العرب

9 – وزارة الموارد المائية والرى

10 – ستاد القاهرة

11 – دار أخبار اليوم

12 – تياهايتس

13 – ماونتن فيو

14 – مدينتى

15 – الكيان بالعاصمة الإدارية الجديدة

16 – توريد مكونات لمصانع لوحات كهربائية

17 – فندق على بابا

18 – مستشفي دار الفؤاد

19 – مبنى يونيكو

20 – مركز عيادات الزهراء

21 – سجون بدر

22 – الإنتاج الحربى

23 – نيو جيزة

24 – دار مصر

25 – سكن مصر

26 – هيئة الأبنية التعليمية

27 – مستشفى 500 500

28 – مبنى بنك الإستثمار العربى

29 – مشروع الموندو بالعاصمة الإدارية

30 – مشروع حى الفلل بمدينتى